Talk:GEOS-5 ADAS Radiance Monitoring: Difference between revisions

Msienkie (talk | contribs)
MetOp-A IASI outage - Technology Test
Msienkie (talk | contribs)
Line 413: Line 413:
== MetOp-A IASI outage - Technology Test ==
== MetOp-A IASI outage - Technology Test ==
* '''14 Sep 2021''' EUMETSAT announced a technology test for MetOp-A IASI.  IASI has been set to the redundant side to do anomaly investigation. 6 days of outage are expected during this test. The outage started 08 September 12z.  Expected end time 2021-09-15 10:00:00.  The notice states "Please note that data generated after the outage might be degraded."
* '''14 Sep 2021''' EUMETSAT announced a technology test for MetOp-A IASI.  IASI has been set to the redundant side to do anomaly investigation. 6 days of outage are expected during this test. The outage started 08 September 12z.  Expected end time 2021-09-15 10:00:00.  The notice states "Please note that data generated after the outage might be degraded."
* An additional technology test is scheduled for 2021-09-16 00:00:00 - 2021-10-15 00:00:00. IASI will scan with oversampling. The data quality is expected nominal for the entire duration of the test. However, the scan pattern will be changed (i.e. 30 scan positions will overlap) as the swath will be reduced from 2200 km to ~200 km. 4 hours of outage are foreseen on the first day of the test.
Return to "GEOS-5 ADAS Radiance Monitoring" page.