Talk:GEOS-5 ADAS Radiance Monitoring: Difference between revisions

Msienkie (talk | contribs)
Msienkie (talk | contribs)
Line 390: Line 390:
* The CrIS-FSR SNPP SW and LW data returned to the data stream as of 6/2/2021 12z.  It is not being assimilated.
* The CrIS-FSR SNPP SW and LW data returned to the data stream as of 6/2/2021 12z.  It is not being assimilated.
* CrIS-FSR SNPP making switch from Side-2 electronics to Side-1 starting 6/12/2021 1107z to 6/14/2021 1749z.  After the sensor side switch is completed, Calibration/Validation efforts will be initiated by the NESDIS/STAR CrIS SDR Algorithm Calibration/Validation Science Team to ensure the SNPP CrIS calibrated data is at the highest quality and meets the JPSS maturity levels. The SNPP CrIS data will not be available until cleared by the calibration/validation science team.
* CrIS-FSR SNPP making switch from Side-2 electronics to Side-1 starting 6/12/2021 1107z to 6/14/2021 1749z.  After the sensor side switch is completed, Calibration/Validation efforts will be initiated by the NESDIS/STAR CrIS SDR Algorithm Calibration/Validation Science Team to ensure the SNPP CrIS calibrated data is at the highest quality and meets the JPSS maturity levels. The SNPP CrIS data will not be available until cleared by the calibration/validation science team.
* CrIS-FSR SNPP data resumes July 22, 2021 at 1400 UTC.  Data is being monitored.
Return to "GEOS-5 ADAS Radiance Monitoring" page.