Talk:GEOS-5 ADAS Radiance Monitoring: Difference between revisions

Msienkie (talk | contribs)
No edit summary
Msienkie (talk | contribs)
Line 389: Line 389:
*''' 24 May 2021''' A problem developed with the LW band on CrIS-FSR SNPP on Friday May 21.  (Date/Time of Initial Impact:  May 21, 2021 1552Z) The instrument is currently using the "Side 2 electronics" - since June 2019.  Discussions are currently ongoing regarding whether to continue using Side-2 without the long-wave channels, or to switch back to Side 1 with missing mid-wave channels.  We are not receiving CrIS-FSR data from the satellite at this time.
*''' 24 May 2021''' A problem developed with the LW band on CrIS-FSR SNPP on Friday May 21.  (Date/Time of Initial Impact:  May 21, 2021 1552Z) The instrument is currently using the "Side 2 electronics" - since June 2019.  Discussions are currently ongoing regarding whether to continue using Side-2 without the long-wave channels, or to switch back to Side 1 with missing mid-wave channels.  We are not receiving CrIS-FSR data from the satellite at this time.
* The CrIS-FSR SNPP SW and LW data returned to the data stream as of 6/2/2021 12z.  It is not being assimilated.
* The CrIS-FSR SNPP SW and LW data returned to the data stream as of 6/2/2021 12z.  It is not being assimilated.
* CrIS-FSR SNPP making switch from Side-2 electronics to Side-1 starting 6/12/2021 1107z to 6/14/2021 1749z.  After the sensor side switch is completed, Calibration/Validation efforts will be initiated by the NESDIS/STAR CrIS SDR Algorithm Calibration/Validation Science Team to ensure the SNPP CrIS calibrated data is at the highest quality and meets the JPSS maturity levels. The SNPP CrIS data will not be available until cleared by the calibration/validation science team.
Return to "GEOS-5 ADAS Radiance Monitoring" page.