Talk:GEOS-5 ADAS Radiance Monitoring: Difference between revisions
getting up to date on recent outages and calibration changes |
|||
Line 338: | Line 338: | ||
* Emails from Stephanie Guedj at EUMETSAT forwarded to the ITWG list indicated that the anomaly is related to the drift/inclination of the Metop-A spacecraft, and that a fix was being worked on. | * Emails from Stephanie Guedj at EUMETSAT forwarded to the ITWG list indicated that the anomaly is related to the drift/inclination of the Metop-A spacecraft, and that a fix was being worked on. | ||
* The data counts began to recover on 23 September, reaching normal levels on 24 September. | * The data counts began to recover on 23 September, reaching normal levels on 24 September. | ||
== IASI MetOp-A calibration change 30 Sep 2019 09:00UTC == | |||
* EUMETSAT announcement 5056 - The non-linearity correction tables for Metop-A IASI are planned to be updated. The impact on the Metop-A IASI level 1c radiances will be around 0.1-0.2K depending on scene temperature. | |||
* RadMon plots show some impact of the calibration change. The bias correction adjusted for the change. | |||
== ATMS SNPP calibration change 15 Oct 2019 == | |||
* An announcement of a calibration adjustment that was broadcast over the TOVS NWP mailing list. The calibration change was between 12UTC and 18 UTC on 15 October 2019. | |||
* RadMon plots show some impact of the calibration change. The bias correction adjusted for the change. | |||
== IASI MetOp-A outage 12-18 November 2019 == | |||
* EUMETSAT announcement 5266 - IASI special patch and dump activity aiming to reduce outage times in case of instrument switch off will cause a prolonged data outage. Start time 2019/11/12 07:10 UTC, end time 2019/11/18 13:00 UTC. |