Talk:GEOS-5 ADAS Radiance Monitoring: Difference between revisions

Msienkie (talk | contribs)
Msienkie (talk | contribs)
No edit summary
Line 294: Line 294:
* [http://www.ssd.noaa.gov/PS/SATS/SPBULL/MSG2691944.01.txt GOES-16 Drift and Transition Plan] posted.  GOES-16 will drift eastward to 75.2 degrees West starting Nov 30 and ending Dec 11 2017.  There will be three days of calibration activity and then GOES-16 will resume nominal operations and officially become GOES-East.  There will be a three week period of overlap with GOES-13.  GOES-13 will remain at 75 degrees West until Jan 2 2018 when it begins drifting to its storage location.
* [http://www.ssd.noaa.gov/PS/SATS/SPBULL/MSG2691944.01.txt GOES-16 Drift and Transition Plan] posted.  GOES-16 will drift eastward to 75.2 degrees West starting Nov 30 and ending Dec 11 2017.  There will be three days of calibration activity and then GOES-16 will resume nominal operations and officially become GOES-East.  There will be a three week period of overlap with GOES-13.  GOES-13 will remain at 75 degrees West until Jan 2 2018 when it begins drifting to its storage location.
* Satellite winds from GOES-16 appeared in the NCEP satwnd files starting 12z 20171221.  The termination of GOES-13 products was delayed due to CWD, The final satellite winds from GOES-13 were in the 20180108 12z satwnd file.
* Satellite winds from GOES-16 appeared in the NCEP satwnd files starting 12z 20171221.  The termination of GOES-13 products was delayed due to CWD, The final satellite winds from GOES-13 were in the 20180108 12z satwnd file.
* The GOES-16 satellite winds are written in a newer BUFR format.  The FP system was modified to handle the new wind format, and for MERRA2 and RPIT (DAS 5.12 systems) the GOES-16 winds are being rewritten in the older GOES-13 format so they can be assimilated without modifying and recompiling the DAS.  The earlier systems had already been using a modified satwnd file with time windowing of the winds to reduce data volume.
== Meteosat-11 to replace Meteosat-10 as primary FES spacecraft February 2018 ==
*  The timeline for transition between Meteosat-10 and Meteosat-11 as primary Full Earth Scan (FES) spacecraft is given on [https://www.eumetsat.int/website/home/TechnicalBulletins/Meteosat/index.html this webpage].  Modifications to the GEOS DAS will probably be minor.
** 6 February 2018 - Start of Meteosat-10 and Meteosat-11 parallel image data and Meteorological product dissemination (with Met-10 as primary FES)
** 20 February 2018 - Meteosat-11 becomes prime FES spacecraft. Parallel Meteosat-10/11 data dissemination continues.
** 6 March 2018 — Meteosat-10 FES image data and product dissemination stops.
Return to "GEOS-5 ADAS Radiance Monitoring" page.