Talk:GEOS-5 ADAS Radiance Monitoring: Difference between revisions

Msienkie (talk | contribs)
Msienkie (talk | contribs)
No edit summary
Line 392: Line 392:
* CrIS-FSR SNPP making switch from Side-2 electronics to Side-1 starting 6/12/2021 1107z to 6/14/2021 1749z.  After the sensor side switch is completed, Calibration/Validation efforts will be initiated by the NESDIS/STAR CrIS SDR Algorithm Calibration/Validation Science Team to ensure the SNPP CrIS calibrated data is at the highest quality and meets the JPSS maturity levels. The SNPP CrIS data will not be available until cleared by the calibration/validation science team.
* CrIS-FSR SNPP making switch from Side-2 electronics to Side-1 starting 6/12/2021 1107z to 6/14/2021 1749z.  After the sensor side switch is completed, Calibration/Validation efforts will be initiated by the NESDIS/STAR CrIS SDR Algorithm Calibration/Validation Science Team to ensure the SNPP CrIS calibrated data is at the highest quality and meets the JPSS maturity levels. The SNPP CrIS data will not be available until cleared by the calibration/validation science team.
* CrIS-FSR SNPP data resumes July 22, 2021 at 1400 UTC.  Data is being monitored.
* CrIS-FSR SNPP data resumes July 22, 2021 at 1400 UTC.  Data is being monitored.
== MetOp-C IASI anomaly 27-29 July 2021 ==
* '''30 July 2021''' After the scheduled maintenance on 27 July, the MetOp-C observations between 648 and 755 wavenumbers showed a shift in the mean bias of themeasurement for the first 24 hours by ~0.3 K then relaxation to near-normal biases.  It was discovered that it was discovered that the operational settings of the MAS subsystem (offsets and gains) was not uploaded after the maintenance.  Adjustment to the operational settings used before the power cycle was performed on Thursday the 29th and IASI-C was back in normal operations at around 2021-07-29 11:11 UTC.
Return to "GEOS-5 ADAS Radiance Monitoring" page.