Talk:GEOS-5 ADAS Radiance Monitoring: Difference between revisions

Msienkie (talk | contribs)
GOES-19 becomes operational 7 Apr 2025
Msienkie (talk | contribs)
Line 525: Line 525:
== GOES-19 becomes the operational GOES-East satellite 7 April 2025 ==
== GOES-19 becomes the operational GOES-East satellite 7 April 2025 ==
* As of April 7, 2025 at 1510 UTC, the GOES-19 satellite has been designated as the Operational GOES-East satellite.  Distribution of GOES-16 data has been discontinued and the satellite is being moved to a storage location at 104.7°W. [https://www.ospo.noaa.gov/data/messages/2025/04/MSG_20250407_1510.html NESDIS message] [https://www.noaa.gov/news-release/noaas-goes-19-satellite-now-operational-providing-critical-new-data-to-forecasters News story]
* As of April 7, 2025 at 1510 UTC, the GOES-19 satellite has been designated as the Operational GOES-East satellite.  Distribution of GOES-16 data has been discontinued and the satellite is being moved to a storage location at 104.7°W. [https://www.ospo.noaa.gov/data/messages/2025/04/MSG_20250407_1510.html NESDIS message] [https://www.noaa.gov/news-release/noaas-goes-19-satellite-now-operational-providing-critical-new-data-to-forecasters News story]
* The GOES AMVs were missing on 10 April due to a problem with product delivery.  [https://www.ospo.noaa.gov/data/messages/2025/04/MSG_20250411_1815.html NESDIS message]
Return to "GEOS-5 ADAS Radiance Monitoring" page.