Talk:GEOS-5 ADAS Radiance Monitoring: Difference between revisions
No edit summary |
end of MODIS winds |
||
Line 495: | Line 495: | ||
* Noise levels for MetOp-C AMSU-A channel have been increasing with an accelerated rate since mid-2022. In early October 2023 the number of rejected data for the channel increased significantly, with an increased number of missing values starting around 7 Oct 2023. The rejected data increased until nearly all of the radiances for channel 4 in the operational stream were missing by 20 Oct. The missing radiances for channel 4 led to rejection of other channels (ch 5, 6) on the instrument. | * Noise levels for MetOp-C AMSU-A channel have been increasing with an accelerated rate since mid-2022. In early October 2023 the number of rejected data for the channel increased significantly, with an increased number of missing values starting around 7 Oct 2023. The rejected data increased until nearly all of the radiances for channel 4 in the operational stream were missing by 20 Oct. The missing radiances for channel 4 led to rejection of other channels (ch 5, 6) on the instrument. | ||
* Due to the large number of rejections, Channels 4,5, and 6 were turned off in FP and in GEOSIT as of 20231020 12UTC. Shortly after that date (24 Oct) the radiance processing was modified and channel 4 data resumed (albeit noisy). Ch 4,5,6 remain turned off for MetOp-C AMSUA. | * Due to the large number of rejections, Channels 4,5, and 6 were turned off in FP and in GEOSIT as of 20231020 12UTC. Shortly after that date (24 Oct) the radiance processing was modified and channel 4 data resumed (albeit noisy). Ch 4,5,6 remain turned off for MetOp-C AMSUA. | ||
== ESPC Legacy Products Retirement of MODIS Winds == | |||
*'''30 Jan 2024''' MODIS wind processing ended January 29 2024. The last date with MODIS winds was 2024/01/29 12z. |