Talk:GEOS-5 ADAS Radiance Monitoring: Difference between revisions

Wrmccart (talk | contribs)
No edit summary
Wrmccart (talk | contribs)
No edit summary
Line 128: Line 128:
=== Aqua AIRS outage 8-10 Feb 2013 ===
=== Aqua AIRS outage 8-10 Feb 2013 ===
*'''11 Feb 2012''' - [http://www.ssd.noaa.gov/PS/SATS/MESS/MSG0410528.01.txt AIRS outage] 8 Feb 21:32 UTC - 10 Feb 01:15 UTC (1 day, 5hrs).  On February 8, 2013 at around 21:17:32 GMT the EOS Aqua AtmosphericInfrared Sounder (AIRS) Instrument Scanner entered Shut-down Mode. Interruption to routine science data collection by the AIRS Instrument. No impact to spacecraft bus operations or the other functioning Aqua instruments. An Anomaly Resolution Team (ART) was assembled that included the JPL AIRS IOT and Project Manager, the Aqua FOT, ESMO Management and the Aqua Mission Director.  A recovery plan was developed, approved and implemented on Saturday, February 9, 2013. The AIRS instrument was returned to its normal operating mode approximately 8:15pm EST.
*'''11 Feb 2012''' - [http://www.ssd.noaa.gov/PS/SATS/MESS/MSG0410528.01.txt AIRS outage] 8 Feb 21:32 UTC - 10 Feb 01:15 UTC (1 day, 5hrs).  On February 8, 2013 at around 21:17:32 GMT the EOS Aqua AtmosphericInfrared Sounder (AIRS) Instrument Scanner entered Shut-down Mode. Interruption to routine science data collection by the AIRS Instrument. No impact to spacecraft bus operations or the other functioning Aqua instruments. An Anomaly Resolution Team (ART) was assembled that included the JPL AIRS IOT and Project Manager, the Aqua FOT, ESMO Management and the Aqua Mission Director.  A recovery plan was developed, approved and implemented on Saturday, February 9, 2013. The AIRS instrument was returned to its normal operating mode approximately 8:15pm EST.
=== SEVIRI/M10 Data outage 1-9(expected) July 2013
*'''8 Jul 2013''' - The satellite is undergoing a [http://www.ssd.noaa.gov/PS/SATS/MESS/MSG1771608.01.txt decontamination procedure].  Should return 9 July.
Return to "GEOS-5 ADAS Radiance Monitoring" page.